Brewer News

Bridge work 4/25/2023

Print
Maine DOT will be doing bridge joint inspections of the Main Street bridge crossing of I395 in Bangor on the night of April 25th.  Inspections will be starting at 6:30 pm and lasting until the early morning hours.  There will be rotating lane closures during the inspection.  Motorists are asked to avoid the area, if possible.